Estimated Value
£7,000,000
Deadline
12 August 2025
Contract Period
20 October 2025 - 31 December 2027
Procurement Method
open
CPV Code
39721411 - Gas heaters
Extracted from the notice; check the official documents.
1.3 We are seeking a contractor for replacing the existing heat network system with a two-pipe system served by gas boilers; all to specified standards and in a timely, consistent, cost effective and safe manner. There will also be a requirement to install new installations as required during the course of the Contract period. 1.4 The term of the contract shall be as soon as possible until November 2026 as further defined within the tender responses 1.5 Southampton City Council reserves the right, to extend the Contractor's appointment for both duration and value to include Phase 2 Design and Build Works with a potential value for phase 2 of between £2.5 - £5m. Phase 2 is currently anticipated to comprise, but shall not be limited to, the replacement of external pipework and upgrades to the boiler room. Such extension shall be subject to mutually agreed terms and conditions, including scope, programme, and remuneration with the incumbent provider required to complete a return for both methodology and price (with the fixed prices demonstrated through this tender) so that the Authority can establish if progression to Phase 2 is right for the Authority at that time. The Authority also reserve the right to not proceed with Phase 2 at all or to establish completion of Phase 2 outside of this contract via a tender. Additional information: Phase 1 value approximately £1.1m Potential Phase 2 approximate value £2.5 - £5m if required
£7m · Awarded 3 Oct 2025 · Contract ends 31 Dec 2027 · Award notice ↗
From award notices on Find a Tender and Contracts Finder. SME or Large is the size the supplier declared on the notice (or, where it is silent, on its latest notice). Values are as published.