Contract for the provision of a C3 stage feasibility design and options study for potential gas diversion works required to enable the proposed DLR Thamesmead Extension. The current alignment of the Thamesmead Extension (TEx) route intersects a highly strategic and asset-dense section of Statutory Undertaker Cadent's London Network, comprising high, intermediate and medium-pressure gas mains, alongside key installations including the Beckton Above Ground Installation and associated pressure reduction infrastructure. These assets present one of the most significant technical and programme-critical risks to the TEx programme. This request relates solely to the Feasibility Design and Options Study (C3 Works), This phase will provide a comprehensive desktop -based assessment of all potential diversion and AGI rationalisation requirements aligned to the current TEx design. The scope includes options development, engagement of a Cadent-approved design house, initial material take-off assessments, high level cost estimates for later phases, and mobilisation of a dedicated multi-disciplinary project management team to coordinate technical interfaces and third party stakeholders. The value for this contract is £1,594,000
CADENT GAS LIMITEDLarge
£1.6m · Awarded 6 May 2026 · Contract ends 24 Feb 2027 · Award notice ↗
From award notices on Find a Tender and Contracts Finder. SME or Large is the size the supplier declared on the notice (or, where it is silent, on its latest notice). Values are as published.