Loading...
Loading...
Loading tenders...
Estimated Value
Not disclosed
Deadline
Not specified
Contract Period
Not specified
Procurement Method
direct
Extracted from the notice; check the official documents.
The Tide-class electrical power and propulsion system is a highly complex system of systems that includes power generation, distribution and conversion machinery. RFA Systems Engineers must be suitably qualified and experienced to conduct onboard maintenance and fault diagnosis on these key systems. This is a crucial principle that underpins RFA platform availability and operational capability. The training courses should provide 12 training places per year for Royal Fleet Auxiliary Personnel.
GE ENERGY POWER CONVERSION UK LIMITEDLarge
£591k · Awarded 5 Aug 2026 · Contract ends 31 Aug 2031 · Award notice ↗
From award notices on Find a Tender and Contracts Finder. SME or Large is the size the supplier declared on the notice (or, where it is silent, on its latest notice). Values are as published.