Loading...
Loading...
Loading tenders...
Estimated Value
£250,000
Deadline
1 October 2025
Contract Period
1 December 2025 - 31 March 2026
Procurement Method
selective
CPV Code
45000000 - Construction work
Extracted from the notice; check the official documents.
Awarded contract via direct award under NHS Hard Facilities Management 2 Framework (SBS10166) Lot 3.3 Low Carbon Energy Infrastructure. The carbon work at Wigan Community Fire and Ambulance Station involves the replacement of the existing gas-fired domestic hot water system with a packaged electric Air Source Heat Pump (ASHP) solution, including all ancillary equipment, housed within an external compound. Plus, the connection of the new ASHPs to the building management system (BMS) to provide control, monitoring (including energy consumption data), and analytics. • The scheme at Wigan is expected to reduce the annual carbon emissions by circa 12.5 tonnes. • The works are to be coordinated in a manner that minimises disruption to daily fire station operations and activities. • The contractor will take responsibility for the design from RIBA Stage 4b and construction RIBA Stage 5. • The formal construction programme will be issued once the formal contractor award is made. • It is proposed that the contract will be awarded on a JCT Minor Works with Contractor's Design 2024 form of contract.
Parr Facilities Management LimitedLarge
£250k · Awarded 17 Nov 2025 · Contract ends 5 Jun 2026 · Award notice ↗
From award notices on Find a Tender and Contracts Finder. SME or Large is the size the supplier declared on the notice (or, where it is silent, on its latest notice). Values are as published.