Loading...
Loading...
Loading tenders...
Estimated Value
Not disclosed
Deadline
Not specified
Contract Period
Not specified
Procurement Method
limited
Extracted from the notice; check the official documents.
The purpose of this commission is for the Contractor to undertake a feasibility study and cost analysis including anticipated return on investment providing a detailed report focusing on: • The reuse of tunnel sump water for tunnel wall washing. • The reuse of building roof and waste water for flushing building toilets and use in sinks and showers. The Contractor shall undertake the feasibility study following RIBA stages: • RIBA stage 0 - Strategic Definition. • RIBA stage 1 - Preparation and Briefing. • RIBA stage 2 - Concept Design. The feasibility study shall consider the reuse and filtration of sump water to current safe water quality standards considering the production requirements of the tunnel washing operations
AECOM LIMITEDLarge
£58k · Awarded 10 Sept 2026 · Contract ends 20 Jan 2027 · Award notice ↗
From award notices on Find a Tender and Contracts Finder. SME or Large is the size the supplier declared on the notice (or, where it is silent, on its latest notice). Values are as published.