Wemyss Metal Mine Works
Key Details
Estimated Value
Not disclosed
Deadline
Not specified
Contract Period
Not specified
Procurement Method
Not specified
CPV Code
45247000 - Construction work for dams, canals, irrigation channels and aqueducts
Free SME-fit check
Is this tender for me?
Deterministic score from the published notice — not an AI prediction.
49
out of 100
Possible SME fit
Some SME-friendly signals, some caution flags. Worth a closer look against your capacity and accreditations.
Deterministic score from the published notice only (SME/VCSE flags, value, lots, deadline window, framework). Not a prediction you will win, and not legal or bid advice.
Try another notice on the free SME-fit checker.
Key requirements
Extracted from the notice; check the official documents.
- Contract period
- 1 Jun 2027 to 1 Sept 2028 (15 months)
- Legal basis
- Procurement Act 2023
- Delivery location (NUTS/ITL)
- UKL (Wales)
- CPV code
- 45247000 Construction work for dams, canals, irrigation channels and aqueducts
- Suitability (buyer's flag)
- SME-suitable
Description
These works will be delivered as part of the Wales Metal Mine Programme (WMMP) between NRW and the Mining Remediation Authority. This programme supports the Western Wales River Basin Management Plan (Western Wales River Basin Management Plan 2021 – 2027 which was published as a final plan in July 2022 (specifically measures CYM49 - Deliver metal (non-coal) mine water programme as identified under the Metal Mine Strategy for Wales and WW0031 - Continue to investigate mine water impact and develop remediation plans in accordance with the Metal Mines Strategy for Wales). This plan has a statutory function associated with the Water Framework Directive (The Water Environment (Water Framework Directive) (England and Wales) Regulations 2017). Works – Summer 2027 • Introduction of an Upper Storage/Attenuation Pond to reduce flows into Upper Mill Race Stream. This will include increasing the existing bund height and installing flow control infrastructure. Approx length 90 metres and approx. height 1.5 metres. • Bypass the circular collapse feature east of Glanville’s Shaft with new open channel. • Introduction of highway drainage system and filter drain to avoid runoff finding its way into the main spoil tip. • A new lined water channel with flow monitors from the public highway to the Nant Cwmnewydion, construing a new ford crossing and improving the existing ford crossing. Approx. length 95 metres.
Suitability
Previously won by
No award has been published for this tender. These are the latest award notices from Mining Remediation Authority for construction work.
CA18/05485 · published 29 Sept 2026
Soil Engineering Geoservices LtdSME
£176k · Awarded 6 Sept 2026 · Award notice ↗
West Cannock Pumping Test & Temporary Treatment · published 25 Aug 2026
J.N. BENTLEY LIMITEDLarge
£1.6m · Award decision 25 Aug 2026 (contract not yet signed) · Contract ends 13 Sept 2027 · Award notice ↗
Langton Mine Water Treatment Scheme (MWTS) Design and Build · published 31 Jul 2026
J N Bentley LimitedLarge
£186k · Awarded 10 Jul 2026 · Award notice ↗
Ground Investigations Works · published 13 Jul 2026
£28k · Awarded 5 May 2026 · Award notice ↗
Ground Investigation · published 13 Jul 2026
Soil Engineering Geoservices LtdLarge
£53k · Awarded 23 Apr 2026 · Award notice ↗
All open tenders and award history for Mining Remediation Authority →
From award notices on Find a Tender and Contracts Finder. SME or Large is the size the supplier declared on the notice (or, where it is silent, on its latest notice). Values are as published.