Estimated Value
Not disclosed
Deadline
Not specified
Contract Period
Not specified
Procurement Method
direct
CPV Code
45315300 - Electricity supply installations
Free SME-fit check
Deterministic score from the published notice — not an AI prediction.
27
out of 100
Challenging for many SMEs
On the published fields alone this looks harder for a typical SME (value, time, or missing SME flag). Exceptions exist — check the notice.
Deterministic score from the published notice only (SME/VCSE flags, value, lots, deadline window, framework). Not a prediction you will win, and not legal or bid advice.
Try another notice on the free SME-fit checker.
Extracted from the notice; check the official documents.
Diversion of an existing UK Power Networks 11kV electricity cable affected by the BM29 Bell Mouth construction works at Stifford Clays Road. The works include management of the 11kV outage, CDM site setup, excavation and reinstatement of approximately 130m of cable duct route, installation of approximately 130m of 11kV 185Al XLPE cable, excavation and reinstatement of two joint bays, installation of two straight joints, traffic management and associated network reconnection works.
UK Power NetworksLarge
£76k · Awarded 2 Oct 2026 · Contract ends 31 Mar 2028 · Award notice ↗
From award notices on Find a Tender and Contracts Finder. SME or Large is the size the supplier declared on the notice (or, where it is silent, on its latest notice). Values are as published.