Back to Tenders
OpenContracts Finderocds-b5fd17-10c912f0-d009-4cfd-8bfe-f45df7bd858d

Manchester International Airport - Shotcrete works

Kier Transportation - CP7 NWC

Key Details

Estimated Value

£500,000

Deadline

16 October 2026(10 days)

Contract Period

10 February 2027 - 27 July 2027

Procurement Method

Not specified

CPV Code

44114100 - Ready-mixed concrete

Free SME-fit check

Is this tender for me?

Deterministic score from the published notice — not an AI prediction.

58

out of 100

Possible SME fit

Some SME-friendly signals, some caution flags. Worth a closer look against your capacity and accreditations.

Deterministic score from the published notice only (SME/VCSE flags, value, lots, deadline window, framework). Not a prediction you will win, and not legal or bid advice.

Try another notice on the free SME-fit checker.

Key requirements

Extracted from the notice; check the official documents.

Tender deadline
16 Oct 2026, 17:00
Estimated value
£250k to £500k
Contract period
10 Feb 2027 to 27 Jul 2027 (6 months)
Delivery location (NUTS/ITL)
NORTH WEST
CPV codes
44114100 Ready-mixed concrete; 45262310 Reinforced-concrete work; 44114210 Concrete piles; 45234000 Construction work for railways and cable transport systems
Suitability (buyer's flag)
SME-suitable

Description

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Preparation and cleaning of exposed contiguous piled retaining wall faces. -Supply and installation of mesh reinforcement, anchor bars and injection mortar. -Supply, delivery, application, curing and finishing of sprayed concrete (shotcrete). -Formation and sealing of expansion and construction joints. -Protection of adjacent assets from rebound, overspray and damage. -Testing, inspection, quality assurance and handover documentation. -Removal and disposal of rebound material, washout and associated waste. -Working within a live rail and airport environment in accordance with all project and Network Rail requirements.

Suitability

SME Suitable

Who won

No award has been published for this tender yet, and we have no earlier award notices from Kier Transportation - CP7 NWC in this sector.

From award notices on Find a Tender and Contracts Finder. SME or Large is the size the supplier declared on the notice (or, where it is silent, on its latest notice). Values are as published.

Publication Info

Published6 October 2026
SourceContracts Finder
CategoryReady-mixed concrete