Loading...
Loading...
Loading tenders...
Estimated Value
£100,000
Deadline
5 August 2026
Contract Period
30 November 2026 - 29 November 2029
Procurement Method
selective
CPV Code
45233100 - Construction work for highways, roads
The Supplier is required to strip topsoil, including residual vegetation clearance and deposition in Topsoil Storage Areas. Topsoil stockpiles are to be managed by the Subcontractor for the duration of the subcontract works, including spraying and treatment necessary by the Subcontractor to maintain the integrity of the material for re-use. The supplier is required to undertake site clearance, to include but not limited to: Wall removal and set aside for reuse Fence removal and disposal Gate removal and disposal Kerb and drainage removal and disposal Sign post removal and disposal Allowance for removal / cutting of tree root systems and disposal Allowance for hard dig and disposal of arisings