Loading...
Loading...
Loading tenders...
Live procurement opportunities from Find a Tender and Contracts Finder
Active Tenders
6699
Closing This Week
315
Total Value
£NaN
Showing 25 of 581 tenders
Supply Install and Commission a MVHR system including all electrical works to 2Nr Properties in Townhill as part of a transforming homes Scheme. Further description in the procurement documents.
Supply and Installation of Replacement Bio-Mass Boiler, Silo, Vacuum Feed & Subsequent Support and Servicing Works will be at the National Coal Mining Museum for England, Wakefield, Yorkshire All enquiries and requests for the tender pack of documents should be made to john.tanner@ncm.org.uk This work is supported by the UK governments Public Bodies Infrastructure Fund A site visit is considered essential for tendering contractors - please contact ian.cawthorne@ncm.org.uk to make the necessary arrangements Please note: your tender return must include completed Pricing Document, Draft Contract and a response to the quality question set out in Appendix A in the ITT. Tenders should be sent to john.tanner@ncm.org.uk by 12 noon on 9th September This is an open tender exercise and this invitation can be passed onto other parties, subsidiaries and delivery partners Please do contact us with any requests for clarifications, responses to which will be sent to all interested parties
Sandwell Council is seeking to appoint a suitably qualified and experienced organisation to undertake a comprehensive Gambling Harms Needs Assessment and support the development of a local Gambling Harms Strategy. The successful supplier will work with key stakeholders to assess local need, identify priority populations and areas for intervention, and provide evidence-based recommendations to inform future commissioning, prevention and partnership activity. Objectives: • Undertake a population-level needs assessment covering all age groups • Understanding of gambling behaviours across different communities in Sandwell • A clear picture of the local gambling landscape • Assess harms across online and in-person gambling • Identify and understand the impact on affected others (families, carers, communities) • Deliver an in-depth qualitative research component • Map current services, pathways and gaps • Identify priority populations and inequalities. • Explore the relationship between ethnicity, racism and gambling-related harms in Sandwell, including any differential experiences, barriers to support and evidence relating to structural inequalities • Develop an evidence-based local Gambling Harms Strategy aligned to national guidance, including the OHID menu of interventions, and local system priorities • Produce a delivery plan with prioritised, actionable recommendations
CONTRACT FOR THE PROVISION AND MAINTENANCE OF FLORAL ARRANGEMENTS WITHIN NESTON, CHESHIRE Neston Town Council invites any companies interested in being considered for this contract as detailed in the specification, to submit a quotation by the closing date of 30 September 2026. Contract specification: the contract specification can be downloaded from www.nestontowncouncil.gov.uk. Please send quotations either by post or email to: Audrey Duncan, Community & Environment Manager, Neston Town Council, Town Hall, Neston CH64 9TR audrey.duncan@nestontowncouncil.gov.uk The contract will be awarded before the end of 2026 and the contract will commence on 1 October 2027. It is anticipated that the contract duration will be three years: one year in the first instance and, if the outcome of a review during the first year is considered successful by both parties, the contract will be extended for a further two years. If you have any queries about the specification, the contract, or the quotation process, please email council@nestontowncouncil.gov.uk or call 0151 336 3840. CLOSING DATE: 30 SEPTEMBER 2026
Betsi Cadwaladr University Health Board (BCUHB) is seeking to appoint a suitably qualified and experienced contractor to undertake the Colwyn Bay Hospital Outpatients Department Roof Upgrade project at Bryn Avenue, Colwyn Bay, LL29 8AY.
Norfolk Broads National Nature Reserve Team manages a suite of nature reserves within Norfolk. We manage a variety of habitats and require adaptable and flexible machinery to ensure we can operate sensitively on the land while undertaking appropriate habitat management. We require a Honda TRX520 FA6 Foreman DCT PS 2 - 4WD with power steering ATV, tow ball fitted and registration plate for agricultural use, to be used for seasonal site management work on a variety of marsh and fen sites.
The Borough Council of Newcastle-under-Lyme is seeking a provider for the installation of new air conditioning at its Knutton Lane, Depot Works, ST5 2SL. The proposal allows for the installation of external condensing units as follows: > Three units mounted at high level on the Fire Station side. > One unit mounted at the rear of the building. > One unit mounted on the opposite side of the building. > Remaining units mounted at low level adjacent to the generator at the front of the building, providing discreet positioning and ease of maintenance access. > Protective security cages can be provided if required.
The National Trust is seeking to appoint a Lead Consultant for the Carrick-a-Rede Visitor Infrastructure Project through a single-stage Request for Proposal (RFP1) process. Bidders will be assessed on their capability, experience, financial standing, proposed methodology, and price. The project aims to sustainably enhance Carrick-a-Rede as a premier visitor destination on the Causeway Coast, supporting increased visitor numbers while protecting the site's natural and cultural heritage, delivering a world-class visitor experience, and minimising impacts on the local community. This commission will develop detailed proposals, and ultimately manage delivery of site infrastructure which is required to support planned growth at the site. Closing Date for RFP - 23rd September 2026 Deadline for Queries - 16th September 2026 Award Contract - 1st October 2026 This opportunity is being conducted on the Proactis Plaza portal. https://supplierlive.proactisp2p.com/ Click on the "Opportunities" button and filter on Customer name - The National Trust All communication is to be carried out via the Proactis portal
The Local Government Association (LGA) is the national membership body for local authorities. It works on behalf of member councils to support, promote, and improve local government. The LGA delivers a programme of children’s services leadership support to councils and corporate and political leaders. This programme is supported through grant funding from the Department for Education (DfE), with a focus on: • Building leadership capacity and capability within local authorities, equipping corporate and political leaders with the skills, confidence and knowledge to lead SEND improvement and deliver SEND reforms. • Strengthening leadership readiness for SEND reform, including improving strategic oversight, system leadership and the effective use of learning and best practice. To support delivery of this programme 2 x Health Engagement Advisers will be contracted to provide associate support to ICBs and councils, specifically in SEND. Bidders must have had recent experience as at a senior strategic ICB level, with a focus on SEND (for example significant experience as a DCO or Chief Nurse for SEND). The roles will require both virtual and face-to-face engagement. The contract period will begin soon as possible following award of contracts and will cover delivery of work in the period up to 31 March 2027. Price Payable: The daily rate is £700 excluding VAT. Reasonable travel and accommodation expenses will also be paid on the production of valid receipts and invoices in accordance with LGA policies. Up to 60 days will be allocated for each of the Health Engagement Advisors up to the completion date of 31 March 2027. This represents a maximum contract value per role of £42,000 (exclusive of VAT). The successful associates will work as part of a national SEND improvement programme, partnering with councils, Integrated Care Boards (ICBs), NHS England and other stakeholders to strengthen SEND services and readiness for reform. Full service requirements are listed in Appendix 1 'Specification' in the ITT document. To apply using link below to our procurement platform, you will need to 'register a new account' first if you haven't already (bottom link on the page). Once registered, to submit: updated CV, references, confirmation of company type and a personal statement that includes the five 'Quality Questions' listed in Appendix 6 of the ITT. With any questions on how to upload or access information provided on this platform, please contact Panacea support team directly. Email: support@panacea-software.com. Telephone: 0207 976 0116.
This project forms part of Historic England’s Technical Guidance Review, which has the overarching aim to ensure our guidance is up to date, reflective of current understanding and best practice for historic building climate change mitigation and adaptation. To this end, Historic England has identified that robust, evidence-based solutions for climate change mitigation in English buildings of traditional construction are needed that demonstrably balance savings in energy and carbon (operational and embodied) across heating and cooling seasons, whilst supporting the climate resilience of fabric and their occupants through the anticipated changes to our climate. As a first step, a literature review and gap analysis is required to determine the current level of understanding of the topic and help steer the development of further research. It will focus on the following research questions: 1. How do the hygrothermal and dynamic thermal properties of English traditional solid wall construction affect whole-building overheating risk and passive cooling performance, and how are these affected by insulation retrofit and future climate scenarios? 2. How do these wall-related effects interact with other whole-building factors, including orientation, solar gain, ventilation, occupancy/use, moisture condition, heating/cooling patterns and other mitigation and adaptation measures? The findings will be presented as an article for publication in a peer-reviewed journal (journal to be agreed) and for publication in Historic England’s Research Report Series format. They will be disseminated through Historic England’s Technical Tuesday webinar series.
With the planned roll-out of HPV self-testing, we may see improvements in uptake rates, however there will still be a need for cervical screening for those where self-testing indicates high risk HPV, meaning that there will be an ongoing need to provide culturally competent and trauma informed interventions in cervical screening services. Previous insights suggest that although there are a small number of specialist services concentrated in major cities in England which provide a range of women’s health services for women who have experienced FGM, including cervical screening, many women are unaware of these or are unable to access them. This project aims to ensure that there is sufficient access to culturally sensitive trauma informed staff able to respond to this need. This will support the objectives of the NHS England » Cervical cancer elimination by 2040 – plan for England. The project will consist of 5 phases: 1. Explore accessibility to HPV self-testing and cervical screening for victims of sexual abuse/trauma/FGM (working with stakeholders). 2. Scope interventions deployed in other countries to ensure self-testing and screening is accessible for these groups. Comprehensive review of published material detailing effective pathways into and subsequent to HPV self-testing, including how those with positive high risk HPV tests are supported in cervical screening. 3. Scope existing educational and informational resources and training in England for healthcare practitioners. Scope what existing educational and informational resources and training has been developed/evaluated to equip healthcare practitioners in supporting women and people with a cervix who have experienced FGM and other types of trauma to engage in HPV self-testing and cervical screening 4. Engage with practitioners to assess current competence and confidence. Engage with practitioners including CS sample takers to assess extent to which they are trained in TIC and how confident they are in their skills and competence in providing TIC, including those in GP and specialist settings. Identify knowledge and training gaps and co-produce any assets required to address identified gaps, e.g. development of content/e-learning /video to include in the NHS Cervical Screening Sample Taker Update Training - (working with relevant sexual abuse/trauma charities). 5. Trial assets and training and evaluate impact with a small group of practitioners Trial a selected set of assets and training with a small group of practitioners supported by training and evaluate the impact on their reported competence and confidence.
The British Council is seeking to identify at least seven further or higher education institutions and local Civil Society Organisations working on relevant ethical media topics to deliver the 20 20 hour Media CONNECT training courses to students and community members across the PEACEPLUS programme area over the next academic year namely 2026 to 2027 and support on site reporting and content production by participants in 17 regions across Northern Ireland and the border areas of Ireland.
Bedfordshire Fire and Rescue Authority is inviting suitable qualified organisations to bid for a modern, fit for purpose self-managed cloud-based Fuel Monitoring System. Bedfordshire Fire and Rescue Authority operate six (6) sites with bunkered diesel vehicle fuel stations, three of which contain dual tanks. The sites are located within the county of Bedfordshire: Fire Headquarters Kempston (2 tanks / 1 dispenser), Bedford Fire Station (2 tanks / 2 dispensers), Stopsley Fire Station (1 tank / 1 dispenser), Luton Fire Station (2 tanks / 2 dispensers), Leighton Buzzard Fire Station (1 tank / 1 dispenser) and Dunstable Fire Station (1 tank / 1 dispenser). The objectives are to: • Provide real-time monitoring of six bunkered fuel site and eight fuel dispensers • Enable full auditability of fuel usage • Reduce human error in recording and reporting as a result of manual processes • Provide accessible management information across the organisation • Support automated fuel reordering and monitoring • Enable all BFRS vehicles to access bunkered fuel with appropriate recording mechanisms • Improve overall fleet fuel management, including non-bunkered fuel users The high level requirements include but are not limited to:- • Installation of Electronic Fuel Capacity Gauges and an Electronic Fuel Monitoring System at each fuelling station. • The information gathered at each fuelling station will be cloud based and be accessed from PCs at BFRA Headquarters Workshops for analysis. • The Fuel Monitoring System must provide relevant monitoring information. • The Fuel Monitoring should, where technically possible, be compatible with the existing High/Low level alarms. • The system must record the mileage of the vehicle as well as the vehicle registration, time of refuelling, and quantity of fuel dispensed into the vehicle.
The purpose of the contract is to provide drainage services as required across the University Estate. The contract will cover both planned preventative maintenance and adhoc requirements.
Lymington and Pennington Town Council is seeking to appoint one suitably experienced Consultation and Engagement Consultant to design, manage and deliver an inclusive public and stakeholder engagement programme for Phase 1 of the Lymington Sea Water Baths Restoration Project. The project is supported by the National Lottery Heritage Fund and will develop the technical, heritage, community, business and operational evidence required to inform the future restoration and sustainable use of the Baths. The Lymington Sea Water Baths were established in 1833 and are one of the earliest surviving open-air seawater bathing facilities in the United Kingdom. The site is an important heritage and community asset with strong connections to local identity, leisure, health and wellbeing. The Phase 1 engagement programme must ensure that community values, needs, aspirations and barriers to participation inform the development of the project and the RIBA Stage 0 to 2 design proposals. The appointed consultant will be responsible for providing accessible opportunities for residents, users, community organisations and other stakeholders to participate in the project. The programme must seek broad and representative participation and actively engage people and groups who may otherwise be underrepresented. The services required will include: Engagement strategy and delivery planning The consultant will prepare a comprehensive Engagement Strategy and Delivery Plan setting out: • The purpose and objectives of the engagement programme. • The proposed engagement methods and timetable. • Target audiences and stakeholder groups. • Arrangements for reaching underrepresented communities. • Accessibility and inclusion measures. • Communications and public-facing messaging. • Data protection, consent and ethical arrangements. • Risks, dependencies and mitigation measures. • Methods for recording, analysing and reporting feedback. Priority audiences are expected to include young people, older residents, disabled people and accessibility groups, lower-income households, leisure and sports users, local residents, community organisations, heritage stakeholders and environmental groups. Engagement Round 1 The consultant will design and deliver an initial round of engagement focused on community values, needs, aspirations and priorities for the future of the Baths. This is expected to include: • An online public survey, with a target of at least 300 responses. • One or two public drop-in engagement sessions. • Three facilitated stakeholder workshops. • Accessible materials explaining the project, its purpose and the matters on which feedback is being sought. The engagement will explore matters including: • Community aspirations for the Baths. • Current and potential future uses. • Barriers to access and participation. • The heritage and cultural value of the site. • Priorities for accessibility and inclusion. • Desired improvements, facilities and activities. • Concerns, opportunities and community expectations. The required outputs will include survey materials, workshop plans, facilitation, analysis of responses and a summary findings report for the Council and Design Team. Targeted engagement The consultant will undertake focused outreach with groups and individuals who may not participate through general public consultation. The targeted programme is expected to engage approximately 40 to 60 participants and may include small group sessions, facilitated discussions, interviews, outreach activities or other suitable methods. The consultant must identify barriers to participation, adapt engagement methods where necessary and ensure that the findings are incorporated into the wider project evidence base and the development of the RIBA Stage 1 and Stage 2 proposals. The required outputs will include a Targeted Outreach Plan and a report summarising participation, findings and recommendations. Engagement Round 2 The consultant will deliver a second round of engagement to gather feedback on the emerging RIBA Stage 2 design proposals. The consultant will work with the appointed Architect, Engineering and Cost Consultant Team to ensure that drawings, visualisations and technical information are presented in a clear and accessible format. The second round is expected to include: • One in-person public exhibition or consultation event. • An online presentation of the emerging proposals. • Digital and in-person feedback opportunities. • Structured collection and analysis of responses, with a target of at least 100 participants or responses. The consultant will facilitate the engagement, analyse feedback and identify matters requiring consideration by the Council and Design Team. Analysis and reporting The consultant will maintain appropriate records of participation throughout the commission and provide qualitative and quantitative analysis of the engagement findings. The final Engagement Report must include: • A summary of the methodology used. • Details of engagement activities undertaken. • Participation and demographic information. • Evidence of the groups and communities reached. • Key themes, concerns, aspirations and priorities. • Identified barriers to access and participation. • Accessibility and inclusion findings. • An explanation of how feedback informed or influenced the project and design proposals. • Matters that could not be incorporated and, where appropriate, the reasons. • Recommendations for future engagement and community participation. The consultant must also prepare a concise National Lottery Heritage Fund formatted summary suitable for inclusion in project reporting, evaluation and future funding submissions. Collaboration and project coordination The appointed consultant will be expected to work collaboratively with: • The Council's client team. • The appointed Project Manager / Project Coordinator. • The Architect, Engineering and Cost Consultant Team. • The Heritage Consultant. • Business planning and market research specialists. • Relevant museums, community organisations and project partners. The consultant will attend project meetings and coordination sessions as reasonably required and provide timely findings to ensure that engagement evidence can influence the project while proposals are still being developed. The consultant must manage expectations through clear communication about the scope of the Phase 1 project, the matters that remain subject to further funding and approval, and how consultation feedback will be considered. Required Phase 1 outputs The required outputs will include: Engagement Strategy and Delivery Plan. Inclusive engagement methodology. Engagement Round 1 survey, workshop and public engagement materials. Facilitation and reporting for Engagement Round 1. Targeted Outreach Plan and findings report. Accessible materials for Engagement Round 2. Facilitation and reporting for Engagement Round 2. Participation and demographic analysis. Final Engagement Report. National Lottery Heritage Fund summary and contribution to the Phase 1 evaluation evidence. All engagement materials and reports must be written in clear, accessible language and be suitable for use by the public, the Council, the wider consultant team and the National Lottery Heritage Fund. The contract value is up to £23,500 excluding VAT. The fee must include all consultant time, project management, meetings, travel, engagement materials, digital tools and licences, venue hire where required, analysis, reporting and delivery of the required outputs. Appointment and mobilisation are expected in late September 2026. The consultant must coordinate the engagement programme with the wider Phase 1 project timetable. All engagement activities, reports and final contributions to the Phase 1 evaluation must be completed no later than 31 August 2027. The original brief establishes the requirement for two engagement rounds, targeted outreach, inclusive participation and a comprehensive final Engagement Report.
Hywel Dda University Health Board (HDUHB) is seeking to commission an experienced Public Arts & Health organisation to develop and deliver a high-quality Arts and Creative Engagement Commission for Atriwm (formally Carmarthen Hwb), the new regional Integrated Health and Wellbeing hub in the centre of Carmarthen, Carmarthenshire.
Lymington and Pennington Town Council is seeking to appoint one suitably experienced Heritage Consultant to undertake a comprehensive heritage review of the Lymington Sea Water Baths as part of a National Lottery Heritage Fund supported feasibility and development project. The Lymington Sea Water Baths were established in 1833 and are among the earliest surviving open-air seawater bathing facilities in the United Kingdom. The site has significant architectural, cultural and social heritage value, but is at risk because of structural deterioration, historic alterations and continued exposure to the marine environment. The consultant will provide an authoritative assessment of the historical development, architectural features, surviving fabric, cultural value and heritage significance of the site. The work will inform architectural and engineering design up to RIBA Stage 2, community engagement, interpretation planning, conservation decision making and the evidence base for future capital funding applications. The commission will include: • Reviewing existing reports, historic surveys, photographs, maps, newspapers, trade directories, archives and local records. • Undertaking archival and documentary research, including engagement with relevant local museums, archives, historians and heritage organisations. • Establishing a detailed chronology of the development and use of the Baths, including their earlier origins, subsequent alterations and changing role within the community. • Assessing the heritage significance of the pool layout, historic engineering, aeration fountains, concrete structures, buildings, setting, views and surviving architectural features. • Assessing the social and cultural history of the Baths, including their contribution to leisure, health, wellbeing, tourism and local identity. • Identifying heritage sensitivities, constraints, risks and opportunities that should inform the design process. • Advising the appointed architectural and engineering team during the development of proposals up to RIBA Stage 2. • Preparing conservation principles and heritage guidance to support future decisions concerning repair, alteration, restoration and development. • Working collaboratively with the Council, Project Manager, Design Team, Quantity Surveyor, Consultation and Engagement Consultant and other appointed specialists. • Providing accessible heritage stories, themes and supporting content for public consultation, exhibitions and future interpretation. • Supporting the integration of heritage considerations into community engagement and design development. The required deliverables are expected to include: A heritage scoping note and initial issues log. A detailed Heritage Review Report, provided in draft and final form. A Heritage Significance Assessment prepared using an appropriate recognised conservation methodology. Heritage advice and design integration notes for the RIBA Stage 0 to 2 design process. Guidance identifying heritage constraints, sensitivities and opportunities. Interpretation themes, stories and accessible heritage content for use in engagement activities and future interpretation. A concise summary suitable for inclusion in National Lottery Heritage Fund reporting, evaluation and future funding submissions. All reports and supporting materials must be clearly written, accessible, appropriately illustrated and suitable for use by the Council, its professional advisers, community stakeholders and the National Lottery Heritage Fund. Research sources and supporting evidence must be clearly referenced. The consultant will be expected to attend project meetings and workshops as reasonably required, provide timely advice during design development and coordinate their work with the wider project programme. The contract is for one Heritage Consultant commission with a maximum available budget of £8,000 excluding VAT. The fee must include all professional time, research, meetings, travel, expenses and preparation of the required deliverables. The tender is expected to be awarded and mobilised in late September 2026. The consultant must programme the work to support the wider feasibility project and the development of the RIBA Stage 2 proposals. All final outputs, approvals and contributions to the Phase 1 evaluation must be completed no later than 31 August 2027.
Lymington and Pennington Town Council is seeking to appoint one suitably experienced Project Manager / Project Coordinator to manage and coordinate the next stage of the Lymington Sea Water Baths Restoration Project. The project is supported by the National Lottery Heritage Fund and will develop the technical, heritage, community, market and business evidence required to inform the future restoration and sustainable operation of the Baths. The Lymington Sea Water Baths were established in 1833 and are one of the earliest surviving open-air seawater bathing facilities in the United Kingdom. The site is a significant local and national heritage asset but is affected by deterioration arising from its age, marine exposure and historic repairs. The appointed consultant will provide single-point responsibility for the coordination, programme management, integration and quality assurance of the project's Phase 1 workstreams. These include architectural and engineering design development to RIBA Stage 2, cost planning, heritage assessment, consultation and engagement, comparator research, market and regional analysis, and business options appraisal. The consultant may deliver the specialist comparator, market and business appraisal work directly or through suitably qualified named subconsultants. Where subconsultants are used, the lead consultant will remain responsible for their management, coordination, quality assurance and integration into the wider project. The Phase 1 services will include: • Preparing and maintaining an integrated project programme. • Coordinating the Project Manager's own focus it on phase one Procurement description Lymington and Pennington Town Council is seeking to appoint one suitably experienced Project Manager / Project Coordinator to manage, coordinate and quality assure Phase 1 of the Lymington Sea Water Baths Restoration Project. The project is supported by the National Lottery Heritage Fund and will develop the technical, heritage, community, market and business evidence required to inform the future restoration and sustainable operation of the Baths. The appointed consultant will provide a single point of coordination for the Phase 1 project and will be responsible for bringing together the work of the Council, Design Team, Quantity Surveyor, Heritage Consultant, Consultation and Engagement Consultant and any specialist subconsultants appointed through this commission. The consultant will not replace the Council's client role and will not have authority to commit Council expenditure without written approval. The services required are: • Preparation and maintenance of an integrated Phase 1 project programme. • Coordination of all Phase 1 workstreams, dependencies, deadlines and required approvals. • Management of project meetings, agendas, notes, action logs and decision records. • Preparation and maintenance of project risk and issue registers. • Monthly progress reporting to the Council. • Support with National Lottery Heritage Fund reporting, monitoring, evidence collation and the final Phase 1 evaluation submission. • Coordination of inputs from the architectural and engineering Design Team, Quantity Surveyor, Heritage Consultant and Consultation and Engagement Consultant. • Review and quality assurance of outputs to ensure that the technical, heritage, engagement, market and business evidence is consistent, practical and suitable for use by the Council and the National Lottery Heritage Fund. • Advice to the Council on programme sequencing, dependencies, risks, governance and decision-making requirements. • Management, coordination and quality assurance of any specialist subconsultants delivering elements of this commission. In addition to project management and coordination, the commission includes responsibility for delivering or managing the following specialist workstreams: Comparator Study The consultant will identify and examine between five and seven relevant United Kingdom lidos, seawater pools or comparable heritage leisure assets. The study will consider matters including: • Governance and ownership arrangements. • Operating models. • Pricing and income generation. • Programming and activities. • Audience development. • Financial and environmental sustainability. • Relevant successes, risks and lessons. The required outputs will include a Comparator Study Report, individual case study summaries and recommendations for Lymington. Market / Regional Profile Review The consultant will assess the current and potential market for the Lymington Sea Water Baths. The work will include: • Analysis of existing and potential audiences. • Consideration of regional tourism, leisure, health and wellbeing markets. • Assessment of competitors and complementary local and regional attractions. • Identification of opportunities to increase participation, visibility and off-season use. • Consideration of inclusion, accessibility and barriers to participation. The required outputs will include a Market / Regional Profile Review, audience segmentation and strategic recommendations for the future positioning and promotion of the Baths. Business Options Appraisal The consultant will assess the potential future operating and governance arrangements for the Baths. The appraisal will include: • Evaluation of Council-led, charitable trust, community interest company, operator-led and hybrid delivery models where relevant. • Development of 10-year financial projections. • Identification of potential income streams and pricing strategies. • Integration of capital and lifecycle cost information supplied by the Quantity Surveyor. • Assessment of risks, assumptions and sensitivity scenarios. • Recommendation of a preferred operational and governance model, supported by clear evidence and reasoning. The required outputs will include a Business Options Appraisal Report, a financial modelling workbook and summary presentation materials for the Council. The consultant will be expected to work collaboratively with the wider project team and ensure that business and market evidence informs the development of the RIBA Stage 0 to 2 design proposals. Emerging design decisions must be considered in relation to future operation, affordability, management, accessibility and long-term sustainability. The final Phase 1 outputs will include: Project initiation note and confirmed delivery programme. Monthly progress reports. Meeting records, action logs and risk and issue registers. Comparator Study. Market / Regional Profile Review. Business Options Appraisal and financial modelling workbook. Executive summary for the National Lottery Heritage Fund feasibility evidence pack. Presentation of findings to the Council and relevant stakeholders. Final coordination and handover report setting out recommendations, risks, next steps and future project requirements. The consultant may deliver the Comparator Study, Market / Regional Profile Review and Business Options Appraisal directly or through suitably qualified subconsultants. Any proposed subconsultants must be identified in the tender submission. The appointed lead consultant will remain responsible for the management, integration and quality assurance of all subcontracted work. Tenderers must provide a fixed fee for Phase 1, separately identifying the project management and coordination fee, specialist workstream fees, any subcontracted elements, expenses, assumptions and exclusions. Appointment and mobilisation are expected in late September 2026. Project initiation must take place within one week of appointment. All Phase 1 outputs must be completed, approved where required, and the final evaluation submitted no later than 31 August 2027.
Velindre University NHS Trust seeks to appoint a professional artist to design and create eight wall-based artworks for the radiotherapy treatment room mazes at the new Velindre Cancer Centre
Velindre University NHS Trust wishes to appoint a professional artist to produce a standalone sculpture to be located in the grounds of the new Velindre Cancer Centre. The sculpture will provide a focal point in the landscape and supporting wayfinding and orientation by drawing people towards the building.
Velindre University NHS Trust wishes to appoint a professional artist to design and create a wall artwork of bespoke, ceramic glazed tiles, enamelled panels or tiles for the breakout space in the Collaborative Centre of the New Velindre Cancer Centre.
Natural England plan to undertake scientific dive surveys of kelp forest communities within the Isles of Scilly Complex Special Area of Conservation (SAC) in summer 2027. This tender relates solely to the provision of a suitably coded vessel and crew to support the scientific diving operations associated with this project.
This commission sits within Natural England's Natural Capital and Economics Teams, which work on evidence to ensure that nature, and the multiple benefits it provides, are considered in decision-making. In 2024, Natural England published a State of Natural Capital Report State of Natural Capital Report (SONC). It brings together the best available evidence on the state of England's natural capital. It aims to wake up policymakers, and other decision-makers, to risks from natural capital loss and convince them to invest in, and protect, nature. SONC contains significant quantitative information. However, its output is qualitative. The lack of quantification means that audiences who are unfamiliar with environmental evidence are unable to weigh the importance of our risk ratings against other risk ratings in their own policy area. This project aims to extend the SONC work into quantification, specifically through reference to 7 risks in the National Risk Register National Risk Register 2025 (NRR). We are working with the idea that changes in the chronic risks impact on the future likelihood and impact of the event risks in the NRR. Specifically, we are interested in the potential of nature recovery to mitigate expected increases in the likelihood and impacts of a selected group of NRR risks which are nature related. Project Aims: This project has two aims. These are: 1) to make the case for nature recovery, through demonstrating the potential for nature recovery to mitigate increases in selected NRR risks. 2) to develop our ability to make quantified connections from SONC to other policy areas to support future work. We are looking for strategic, proportionate and complexity-sensitive quantification, and set out further what we mean by this below.
The Science Museum Group wishes to appoint a Supplier to provide Hybrid Meeting Room Support. Science Museum Group (SMG) currently have meeting rooms using Yealink video conferencing with Microsoft Teams. Our current support management contract has expired, and we wish to tender for an organisation to provide this service for us.