Pipeline (no deadline published)Find a Tenderocds-h6vhtk-06d975

Strategic Charging Infrastructure Scheme

National Highways Limited

Key Details

Estimated Value

£158,333,330

Deadline

Not specified

Contract Period

Not specified

Procurement Method

Not specified

CPV Code

45317300 - Electrical installation work of electrical distribution apparatus

Free SME-fit check

Is this tender for me?

Deterministic score from the published notice — not an AI prediction.

43

out of 100

Challenging for many SMEs

On the published fields alone this looks harder for a typical SME (value, time, or missing SME flag). Exceptions exist — check the notice.

Deterministic score from the published notice only (SME/VCSE flags, value, lots, deadline window, framework). Not a prediction you will win, and not legal or bid advice.

Try another notice on the free SME-fit checker.

Key requirements

Extracted from the notice; check the official documents.

Estimated value
£158.3m£190m including VAT
Contract period
1 Jul 2027 to 31 May 2028 (11 months)
Legal basis
Procurement Act 2023
Delivery location (NUTS/ITL)
UKC (North East), UKD (North West), UKF (East Midlands), UKG (West Midlands), UKJ (South East), UKK (South West) and 1 more
CPV codes
45317300 Electrical installation work of electrical distribution apparatus; 45310000 Electrical installation work; 45220000 Engineering works and construction works; 71322000 Engineering design services for the construction of civil engineering works
Suitability (buyer's flag)
SME-suitable

Description

National Highways is working in collaboration with the Office for Zero Emission Vehicles (OZEV), a joint unit between the Department for Transport and the Department for Energy Security and Net Zero, to strengthen electricity network capacity to selected motorway service areas (MSA) in England through the Strategic Charging Infrastructure (SCI) Scheme. The transition to zero-emission vehicles is expected to drive significant growth in demand for electric vehicle (EV) charging at MSAs. This will require a visible and functional charging network across the motorway network to support current and future EV drivers and provide confidence when undertaking long-distance journeys. However, at several locations, the deployment of charging infrastructure is constrained by the existing electricity network capacity. In some cases, the cost of grid upgrades to meet future demand is not commercially viable for industry and represents a key barrier to the provision of additional EV charging infrastructure. The SCI Scheme will support the development of a strong open-access (can be used with any EV vehicle regardless of manufacturer) EV charging network across the motorway network by strengthening electricity network infrastructure to selected MSAs where investment is not commercially viable. The resulting network capacity will then be available to firms installing EV charging at the site at a subsided and commercially viable price. An indicative allocation of £190 million has been made for the scheme. Enabling civils works, such as land preparation and substation housing, to ensure all funded sites meet a minimum standard at adoption and connection stage, may also be within scope of the packages where required. Further details are provided within a separate scope document that can be accessed via this link: https://highways.sharepoint.com/:f:/s/NationalHighwaysProcurement-MaterialforExternalRelease/IgDtJCSl2pP2R7XoJFkawLs4AWlSqYeOoUX2WNXcMEkbYWM?e=iZisZL Following completion of Phase 1 Pre-Market Engagement, which focused on understanding supplier capability, National Highways is undertaking Phase 2 of Pre-Market Engagement to seek supplier feedback on potential delivery, packaging, commercial, evaluation and route to market options for the SCI Scheme. The objective of this engagement is to gather market feedback that will help National Highways refine its approach to best support the effective delivery of the SCI Scheme, whilst maximising market participation, supporting private sector investment, and delivering value for money. The questionnaire for interested suppliers to complete is available via this link: https://forms.cloud.microsoft/e/P3t3TXQUUN. The information provided in response to this questionnaire will be collected, processed and stored solely for the purposes of designing and progressing the SCI Scheme. The information provided in the response to the Pre-Market Engagement questionnaire will not constitute a formal tender response and will not be used to evaluate suppliers as part of any future procurement process. Responses will be used solely to inform the development of the SCI Scheme procurement strategy, including the delivery, packaging, commercial and route-to-market approaches. National Highways thanks you for taking the time to complete this questionnaire. This pre-market notice will be open for a calendar month, ending on 30 October 2026. Should suppliers have any difficulty with the questions or accessing any of the documents, please send an email to the ADProcurement@nationalhighways.co.uk inbox.

Suitability

SME Suitable

Previously won by

No award has been published for this tender. These are the latest award notices from National Highways Limited for construction work.

PDF Framework - PDF Framework - A47 EWch-WBil light&rdmk+WBil-A1122 rsv rsf Pk2.02 · published 5 Oct 2026

LTC-UKPN 11kV Rectory Road Road (E-UKPN-11kV-0017) (Bell Mouth Construction) · published 2 Oct 2026

LTC-UKPN 11kV Stifford Clays Road (E-UKPN-11kV-0015) (Bell Mouth Construction) · published 2 Oct 2026

PDF Framework - Skid Resistance resurf 2026-27 West Works Pk2.06 · published 2 Oct 2026

PDF Framework - A21 Quarry Hill Exp Joints · published 2 Oct 2026

All open tenders and award history for National Highways Limited →

From award notices on Find a Tender and Contracts Finder. SME or Large is the size the supplier declared on the notice (or, where it is silent, on its latest notice). Values are as published.

Publication Info

Published28 September 2026
SourceFind a Tender